You don't have javascript enabled. Good luck with that.
Pencarian
Pasukan Biru Bangun Tanggul di Sisi Utara Pulau Untung Jawa

Embankment Being Built on North Side of Untung Jawa Island

A solid cube embankment is being built on the north side of Untung Jawa Island, precisely in front of SDN Untung Jawa 01 Pagi, Jalan Bougenville, RT 02/03, Untung Jawa Urban Village, South Seribu Islands Sub-district.

Hopefully, residents feel safer and more comfortable 

Seribu Islands SDA Sub-agency Head, Mustajab said the embankment is built to protect land areas from tidal waves or locally rob.

"Previously, there was no embankment, only sandbags. This embankment also serves as a boundary for the island," he expressed, Friday (5/23).

Embankment in Untung Jawa Island's Main Pier Area Repaired

He explained the construction of the embankment is conducted over a length of 84 meters with a solid cube arrangement of 3 to 2, or a height of 1.2 meters and a width of 80 centimeters.

"After the construction, the casting process will continue to make the embankment stronger and neater," he explained.

He added the work that involved ten personnel has been ongoing since early May 2025. It is targeted for completion next week.

"Everything went smoothly and hopefully this embankment can protect the land of Untung Jawa Island from wave impacts, especially during bad weather," he added.

The work received appreciation from RW 0 Chairman, Untung Jawa Urban Village, Basri Selamet.

"Hopefully, residents feel safer and more comfortable and protect the environment from the crashing waves," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close